What a real conversion timeline looks like
A 14-employee remodeler with six years of Desktop history, converted over three weeks with no missed payroll.
| Stage | Work done | Elapsed |
|---|---|---|
| Week 1 | File review, condense decision, list and item cleanup, open AR/AP verified | Days 1–5 |
| Week 2 | Test conversion, balance sheet tie-out to the Desktop trial balance, payroll re-setup | Days 6–10 |
| Week 3 | Final conversion after month-end close, bank feeds connected, projects and cost codes rebuilt | Days 11–15 |
| After | Two parallel weeks of reporting checks, then Desktop retired to read-only | Days 16–30 |
Convert right after a closed month end so there is one clean cut-over date to reconcile against.